Jump to content

      



























Photo

[Trans Canada Highway] McKenzie Interchange - McKenzie Avenue, Admirals Road and TCH


  • Please log in to reply
2245 replies to this topic

#1161 VicHockeyFan

VicHockeyFan
  • Suspended User
  • 52,121 posts

Posted 29 July 2016 - 09:19 PM

The station in SFO was under construction when I was there last week, but admittedly I'm not aware of the specifics.

 

Isn't LA-SFO to be the hyperloop route?

 

http://www.usatoday....-wars/84137224/


<p><span style="font-size:12px;"><em><span style="color:rgb(40,40,40);font-family:helvetica, arial, sans-serif;">"I don’t need a middle person in my pizza slice transaction" <strong>- zoomer, April 17, 2018</strong></span></em></span>

#1162 Layne French

Layne French
  • Member
  • 355 posts

Posted 01 August 2016 - 08:16 PM

^ I think that is on hold due to cost.

They are  still working on it, it is being phased with most construction currently between Fresno and Madera I believe. Eitherway the central valley is where most of the work is happening atm due to less complexity with the more urban areas.


Edited by Layne French, 01 August 2016 - 08:18 PM.


#1163 malahatdrive

malahatdrive
  • Member
  • 186 posts

Posted 11 August 2016 - 12:38 PM

Tender for the new Galloping Goose overpass will be tendered this week. Some site preperation activities will begin this month.

 

https://news.gov.bc....TRAN0225-001431

 

 



#1164 malahatdrive

malahatdrive
  • Member
  • 186 posts

Posted 15 August 2016 - 09:40 AM

Tender for Phase 1 release today. Tender closes in 23 days.

 

  Location: Highway 1 in the District of Saanich at the intersection of Highway 1 and McKenzie Avenue, British Columbia, Canada

 

 

 

Description: Phase 1 construction of a new Interchange at Admirals Road and McKenzie Avenue on Highway 1. Rock excavation, preload fill supply and installation, design and construction of Proprietary MSE Walls, demolition of an existing pedestrian overpass, installation of temporary pedestrian overpass, construct Galloping Goose Trail overpass, construct welded steel and PVC watermains including valves and chambers, construct asphalt and gravel multi-use pathways, asphalt paving.

#1165 Rob Randall

Rob Randall
  • Member
  • 16,310 posts

Posted 16 August 2016 - 11:45 AM

This made the front page of the "Mildly Interesting" subreddit:

 

 

 

There were 6 red cars in a row at the stop light today

 

http://imgur.com/axN6nkx


Edited by Rob Randall, 16 August 2016 - 11:47 AM.


#1166 nagel

nagel
  • Member
  • 5,751 posts

Posted 16 August 2016 - 11:51 AM

That's TCH/Tillicum.



#1167 aastra

aastra
  • Member
  • 20,912 posts

Posted 16 August 2016 - 11:52 AM

What next? Black vehicles only on Douglas? White vehicles only on Cormorant?

http://vibrantvictor...-1463071274.jpg



#1168 Rob Randall

Rob Randall
  • Member
  • 16,310 posts

Posted 16 August 2016 - 11:53 AM

That's TCH/Tillicum.

 

Oh, I thought it was McKenzie.

 

When you click an image link like that on Reddit it could be literally any point on the globe, yet the instant I saw that image I knew it was the TCH. Weird. Because it's not like there are any unique landmarks shown.


Edited by Rob Randall, 16 August 2016 - 11:54 AM.


#1169 aastra

aastra
  • Member
  • 20,912 posts

Posted 16 August 2016 - 12:02 PM

Did you ever play www.geoguessr.com? Sometimes it really is amazing how you can do a quick 360 in some spot you've never seen before in your life and then guess where it is to less than a few miles. Also odd, Bear Mountain was a location in one of my very first games.
 


  • nagel likes this

#1170 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 07:22 AM

Groundbreaking is today at noon.


  • 57WestHills likes this

#1171 57WestHills

57WestHills
  • Member
  • 1,272 posts

Posted 29 September 2016 - 07:24 AM

Is there a ceremony?

#1172 HB

HB
  • Banned
  • 7,975 posts

Posted 29 September 2016 - 07:26 AM

So they are having a ground breaking but the winning contractor has yet to be announced?? Or it has? If so who won the contract.



#1173 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 07:27 AM

Yes with Todd Stone.  Portage at Esson.  Same spot as the 2015 announcement I assume.


  • 57WestHills likes this

#1174 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 07:29 AM

So they are having a ground breaking but the winning contractor has yet to be announced?? Or it has? If so who won the contract.

Sorry, don't know who won the phase 1 contract.



#1175 57WestHills

57WestHills
  • Member
  • 1,272 posts

Posted 29 September 2016 - 07:29 AM

I'll swing by. Curious if there's a contractor announcement and timeline details.

#1176 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 07:31 AM

I might swing by too.  If you see a guy with a weird bike with a toddler on the front, come say hi.



#1177 HB

HB
  • Banned
  • 7,975 posts

Posted 29 September 2016 - 07:58 AM

Sorry, don't know who won the phase 1 contract.

Seems odd to have a ground breaking with out a public announcement ahead of time of who the primary contractor is.

I will hazard a guess ...#1 Guess Jacob Bros   #2 guess Scansa



#1178 Mike K.

Mike K.
  • Administrator
  • 83,988 posts

Posted 29 September 2016 - 08:14 AM

Construction starts on $85 million McKenzie interchange

http://victoria.citi...ie-interchange/


  • sebberry likes this

Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.


#1179 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 08:50 AM

I think you meant fall 2018 not 2019 Mike.



#1180 nagel

nagel
  • Member
  • 5,751 posts

Posted 29 September 2016 - 11:08 AM

Jacob bros

You're not quite at the end of this discussion topic!

Use the page links at the lower-left to go to the next page to read additional posts.
 



1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users