Photos from November 25th
BUILT Encore Uses: condo, townhome Address: Sitkum Road at Saghalie Road Municipality: Victoria Region: Urban core Storeys: 17 Condo units: (studio/bachelor, 1BR, 2BR, 3BR, penthouse) Sales status: sold out / resales only |
Learn more about Encore on Citified.ca
[Vic West] Encore at Bayview Place | Condos | 17-storeys; 56 meters | Under construction
#441
Posted 25 November 2016 - 04:49 PM
- Nparker, 2F2R and Bellbottoms like this
Marko Juras, REALTOR® & Associate Broker | Gold MLS® 2011-2023 | Fair Realty
www.MarkoJuras.com Looking at Condo Pre-Sales in Victoria? Save Thousands!
#442
Posted 26 November 2016 - 09:10 AM
Question: With the concrete base for the crane in, will the crane sit outside the tower as it did at the promontory or will it be within the structure as at the low rise at the Encore? Different builders.
Some followers might find visiting the blog on the VV Promontory of interest, since many issues are likely to be similar. Crane construction there is at about page 18 of 162.
#443
Posted 26 November 2016 - 10:06 AM
See #418.
The first crane for the smaller tower is well within the building. The crane for the larger tower looks like it will sit just outside the building.
In the first picture in #441 you're looking at the base for the elevator shaft, not the crane. The crane will be much closer to where the picture was taken from.
Looks like the form for the crane base will be going up this week, so then it will be more obvious.
#444
Posted 26 November 2016 - 12:16 PM
Thanks. But note that in 418 the crane for the low rise is shown outside of the building.
#445
Posted 26 November 2016 - 01:49 PM
Question: With the concrete base for the crane in, will the crane sit outside the tower as it did at the promontory or will it be within the structure as at the low rise at the Encore? Different builders.
My rough eye ball estimate says it looks like the larger crane will sit outside of the tower.
Marko Juras, REALTOR® & Associate Broker | Gold MLS® 2011-2023 | Fair Realty
www.MarkoJuras.com Looking at Condo Pre-Sales in Victoria? Save Thousands!
#446
Posted 26 November 2016 - 03:58 PM
Both cranes are outside their respective towers but within the parkades - so there is a degree of "rightness" in everyone's observations.
- Nparker likes this
#447
Posted 26 November 2016 - 04:06 PM
Both cranes are outside their respective towers but within the parkades - so there is a degree of "rightness" in everyone's observations.
Gary, just out of curiosity have you noticed any differences in construction technics, process, or overall design between Promontory/Encore that might be interesting?
Marko Juras, REALTOR® & Associate Broker | Gold MLS® 2011-2023 | Fair Realty
www.MarkoJuras.com Looking at Condo Pre-Sales in Victoria? Save Thousands!
#448
Posted 30 November 2016 - 07:55 PM
Marko, I really haven't been following it that closely as I don't have any skin in the game.
That said, it appears to be following the same tried and true construction techniques we've seen on other concrete tower projects.
#449
Posted 30 November 2016 - 08:07 PM
While we can clearly see the main tower's foundation core pit is ready for formwork, that concrete pour on the north side among the bedrock may in fact be the footing for the second tower crane. However, I don't see any tower anchors in there, at least in the shots I took.
- 2F2R likes this
#450
Posted 30 November 2016 - 08:42 PM
The anchor is still sitting at the Roundhouse, right next to the turntable.
#451
Posted 01 December 2016 - 08:24 AM
The anchor is still sitting at the Roundhouse, right next to the turntable.
and with that... do they actually pour the 'whole anchor' INTO the cement ? The anchor meaning YELLOW medal that holds the large bolts ?
#452
Posted 01 December 2016 - 09:53 AM
Here is the first tower crane's base from a few pages back. The anchor rods go into the concrete and the yellow base bolts onto it. Taller cranes require longer, beefier anchor rods and a deeper concrete footing to place them in. The last pictures are of Promontory's tower crane base. I suspect that just like with Promontory they're forming the crane platform and will then form the actual anchor footing. It could also be this concrete pour has nothing to do with the tower crane but I doubt it.
- Nparker, 2F2R and Prom2 like this
#454
Posted 01 December 2016 - 12:11 PM
Thanks for the visual. I see now.... and actually remember the Encore base going in. YES.
#455
Posted 12 December 2016 - 12:57 PM
- Nparker, 2F2R and Bellbottoms like this
#456
Posted 14 December 2016 - 02:32 PM
Starting next Monday the 19th we’ll be erecting the 2nd tower crane.
Mobile crane set up Monday 19th and scheduled to be completed by end of day Tuesday, 20th. All of these times are based on weather conditions ( mainly winds )
- Nparker likes this
#457
Posted 20 December 2016 - 11:09 AM
We are back up to 10 cranes on the skyline. The crane is being erected at this site today started this morning
- Nparker likes this
#458
Posted 20 December 2016 - 01:14 PM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#459
Posted 20 December 2016 - 01:25 PM
#460
Posted 20 December 2016 - 01:35 PM
11:57am Due to the inclement weather conditions today and a late start yesterday another day is required for the erection of the tower crane . Sorry for any inconvenience Encore Superintendent
Use the page links at the lower-left to go to the next page to read additional posts.