View Single Post
  #557  
Old 06-27-2009, 02:13 PM
jklymak's Avatar
jklymak jklymak is offline
 
Join Date: Feb 2007
Location: Downtown
Posts: 1,285
Default

^ Of course Victoria will build down. Aside from red herrings like the turn at the bottom of the hill (which has nothing to do with the bridge) the cost comparison made by tear-down proponents is between restoration of a beautiful bridge and building a new generic bridge. Lets see an actual quote on refurbishing the bridge, rather than a back-of-the-envelope estimate, and lets see the design and a real quote for the new bridge. Until then, we are just trusting the word of a single engineering study, which Ms B. has pointed out was undertaken by a company likely to bid on building a new bridge.
Reply With Quote