BUILT Hudson Place One Uses: condo, commercial Address: 777 Herald Street Municipality: Victoria Region: Downtown Victoria Storeys: 25 Condo units: (studio/bachelor, 1BR, 2BR, sub-penthouse, penthouse) Sales status: sold out / resales only |
Learn more about Hudson Place One on Citified.ca
[Downtown Victoria] Hudson Place One | Condos; commercial | 25-storeys | Built - Completed in 2020
#122
Posted 20 November 2016 - 05:19 PM
The developer already has zoning for 24 floors in place at this point, as far as I remember anyway. It would be shocking to me for Townline to leave floor space and revenue on the table. This really is a unique opportunity to construct a landmark building.
Agree. That two-block section as I see it will extend the downtown core northward. It needs to be significant, not watered down.
- 2F2R and jonny like this
#123
Posted 20 November 2016 - 05:28 PM
They are not scaling back. That much I do know
Fabulous. Looking forward to seeing the plans!
- 2F2R likes this
#124
Posted 22 November 2016 - 08:36 AM
Today's T-C has an article that talks about Townline's planning for the site... no new information but it does state that the mixture of condo/rental hasn't been determined.
http://www.timescolo...-site-1.3038632
#125
Posted 22 November 2016 - 09:29 AM
I assume with the large number of units Hudson Place could potentially produce, Townline really wants to get it right. I sure hope there aren't too many more delays getting this started. I remain nervous there could still be a reduction in height/density as a cost-cutting measure, which I think in the long run would be a big mistake. I would think the tremendous success with Hudson Walk 1 (and presumably HW2) Townline would have a good sense of the local market conditions.
- DavidSchell likes this
#126
Posted 24 November 2016 - 06:35 PM
- Nparker, 2F2R and DavidSchell like this
#127
Posted 25 November 2016 - 08:12 AM
Edited by nagel, 25 November 2016 - 08:13 AM.
- Nparker likes this
#128
Posted 25 November 2016 - 09:39 AM
- Nparker, 2F2R and Prom2 like this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#129
Posted 25 November 2016 - 11:48 AM
#130
Posted 25 November 2016 - 12:54 PM
I've finally somewhat mastered that thing
- Nparker and Prom2 like this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#131
Posted 25 November 2016 - 12:57 PM
- Nparker and 2F2R like this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#132
Posted 25 November 2016 - 01:00 PM
#133
Posted 25 November 2016 - 01:52 PM
Somehow that does not seem like the most efficient way to do it.
- lanforod likes this
#134
Posted 25 November 2016 - 02:02 PM
Somehow that does not seem like the most efficient way to do it.
I was working in the Jack Davis Building when the first half of the parkade was demolished. I seem to recall it came down fairly quickly.
#135
Posted 26 November 2016 - 11:55 PM
^-- I could see a bit of that demolition happening yesterday from my desk at work. Not as good an angle as the overhead shot.
#136
Posted 27 November 2016 - 05:55 AM
They will probably grind it up into small chunks, blend it with St. Andrews School and it will be part of a new building elsewhere in the city.
#137
Posted 27 November 2016 - 07:27 AM
It becomes road base and the like. Not structural stuff.
#138
Posted 27 November 2016 - 07:38 AM
It becomes road base and the like. Not structural stuff.
When they ground up the old Memorial Area on site, that stuff became the base for the ice surface at SOFA, which was a fitting use to maintain the memorial aspect.
#139
Posted 27 November 2016 - 09:28 AM
#140
Posted 27 November 2016 - 11:50 AM
Silica is in concrete.
From WorkSafeBC
Silica is the most common hazard on a work site. Silica dust can cause silicosis, a serious and irreversible lung disease. It can also cause lung cancer. Cutting, breaking, crushing, drilling, grinding, or blasting concrete or stone releases the dust. As workers breathe in the dust the silica settles in their lungs.
Its one of those not-an-immediate-health-risk compounds but a prolonged exposure risk.
All the workers are wearing masks and they're spraying the concrete as they demo. Must be some tasty stuff in there.
Use the page links at the lower-left to go to the next page to read additional posts.
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users