Can we get a pouring update please?
BUILT 1515 Douglas Street Uses: office, commercial Address: 1515 Douglas Street Municipality: Victoria Region: Downtown Victoria Storeys: 6 |
Learn more about 1515 Douglas Street on Citified.ca
[Downtown Victoria] 1515 Douglas and 750 Pandora | Office; commercial | 6- & 13-storeys (53.6m & 27.4m) | Completed - Built in 2018 and 2017
#961
Posted 23 February 2017 - 06:36 PM
#962
Posted 23 February 2017 - 07:43 PM
That's why we pore over this thread. We want something concrete, the sort of hard info that can cement VV's reputation as the source for development updates. Save the "poor me" stuff for another board. It has no part in this mix.
- Nparker and grantpalin like this
#963
Posted 23 February 2017 - 09:02 PM
That's why we pore over this thread. We want something concrete, the sort of hard info that can cement VV's reputation as the source for development updates.
the "poor me" stuff for another board. It has no part in this mix.
This needs to stop as earlier today Mike was getting "the chuckles" and I don't think there's a cure for that.
#964
Posted 23 February 2017 - 10:41 PM
For a pouring update, one of the campbell crew helped me pour self leveling cement in my basement, and lent me his trowel for laying out the mortar mix. It is now curing. The beer soon will be poured in thanks.
#965
Posted 24 February 2017 - 09:55 AM
Hey, if you guys don't want updates, I'll stop. I thought pouring the final floor on one of downtown Victoria's more significant buildings in it's entire history would have been sorta big news on a pro development forum.
I suppose we should get back to complaining about bicycle lanes, then.
Wait, there's a bike lane going into the 13th floor?
#966
Posted 24 February 2017 - 10:04 AM
Technically the bike lane comes down from the 13th floor only. Nobody will be using it to go up, it's much too steep.
- Nparker likes this
#967
Posted 26 February 2017 - 10:26 AM
I wonder why bcIMC even needs employees. Send a cheque to Ontario Teachers to take care of along with theirs. I fail to see why we need a team overseeing BC employees' pension money any differently than any other pension fund. And they probably do not need it spent at Glo for drinks.
I just looked at the two most recent annual reports for bcIMC and Ontario Teachers. It appears the former has a total annual management cost of 24 cents per $100 under management, the latter is 78 cents. bcIMC manages their fund for less than Teachers, and creates 100's of local Victoria jobs in the process.
Edited by finnamored, 26 February 2017 - 10:48 AM.
- Nparker and shoeflack like this
#969
Posted 09 March 2017 - 09:26 AM
Wow. Awesome photo. Thanks jessief!
“To understand cities, we have to deal outright with combinations or mixtures of uses, not separate uses, as the essential phenomena.”
- Jane Jacobs
#970
Posted 09 March 2017 - 09:35 AM
Re-bar has started to be erected to support the top deck/roof of the final floor. Full height (except for mechanical structures) will soon be achieved on at least part of the tower.
#971
Posted 17 March 2017 - 02:44 PM
I think you guys are wrong, this doesn't look like the top mechanical floor to me. I always thought it strange to have a tower crane so much higher than the roof - you don't just add extra mast sections for the fun of it. It certainly looks to me like the mechanical floor will be the floor above this. Does anyone agree? Concrete pours by bucket now.
- 2F2R likes this
#972
Posted 17 March 2017 - 02:45 PM
I agree with Gary. That's the 13th floor so logically it needs a roof, and then mechanical.
- jonny likes this
#973
Posted 17 March 2017 - 02:56 PM
Nagel, you are correct. They are working on the 13th floor. The next level will be the ceiling of the 13th floor. The mechanical penthouse will be next.
#974
Posted 17 March 2017 - 03:04 PM
...It certainly looks to me like the mechanical floor will be the floor above this. Does anyone agree? Concrete pours by bucket now...
I echo the chorus. The "tower" currently has 13 "floors" poured (this includes the ground level). Supports are going in to hold up the "roof" of the 13th floor. The mechanical level will be above.
#975
Posted 17 March 2017 - 03:32 PM
#976
Posted 23 March 2017 - 10:52 AM
- Nparker, RoadRunner and DavidSchell like this
#977
Posted 23 March 2017 - 12:28 PM
Very cool.
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#978
Posted 24 March 2017 - 10:08 AM
The first of the temporary supports that will hold up the "roof" (but not the mechanical level) are being erected on the eastern side of the Pandora tower.
Edited by Nparker, 24 March 2017 - 10:09 AM.
#979
Posted 29 March 2017 - 11:54 AM
- Nparker likes this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#980
Posted 29 March 2017 - 12:02 PM
Almost to full height on the tower.