I notice blasting mats are present on this site, but considering the current stage of construction at Legato, has any blasting taken place at 989 yet?
Thye did one small one. this week has been focused on drilling
BUILT 989 Johnson Uses: condo, commercial Address: 989 Johnson Street Municipality: Victoria Region: Downtown Victoria Storeys: 17 Condo units: (studio/bachelor, loft, 1BR, 2BR, sub-penthouse, penthouse) Sales status: sold out / resales only |
Posted 30 September 2016 - 08:03 PM
I notice blasting mats are present on this site, but considering the current stage of construction at Legato, has any blasting taken place at 989 yet?
Thye did one small one. this week has been focused on drilling
Posted 10 October 2016 - 12:57 PM
I just walked past this site and noticed what appear to be piles being sunk into the eastern side of the lot. Can someone with more engineering knowledge than I have please explain why this is being done in an area that I presume will be fully excavated multiple meters deep? Thanks in advance.
Posted 10 October 2016 - 01:51 PM
Posted 10 October 2016 - 01:59 PM
Those things sure had my office e building shaking when they where driving them in.
Be prepared for additional shaking - there appear to be quite a few more going in.
Posted 10 October 2016 - 02:37 PM
Posted 10 October 2016 - 02:52 PM
Yeah... my nerves are going to wrecked.
You'll be fine. We had 9 months of shaking at 1515 Blanshard during the blasting for 750 Pandora. You get used to it.
Posted 10 October 2016 - 04:13 PM
Be prepared for additional shaking - there appear to be quite a few more going in.
Posted 12 October 2016 - 03:15 PM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
Posted 12 October 2016 - 03:16 PM
I just walked past this site and noticed what appear to be piles being sunk into the eastern side of the lot. Can someone with more engineering knowledge than I have please explain why this is being done in an area that I presume will be fully excavated multiple meters deep? Thanks in advance.
Still hoping for an explanation of pile driving ahead of excavation...
Posted 12 October 2016 - 03:34 PM
Oh that's interesting - are those Legato's exterior parkade wall forms? It sure looks like it since we're seeing the backside. That would mean the 989 Johnson project has completely removed Legato's retaining wall, with its encroaching steel anchor rods, since it is no longer needed.
Posted 12 October 2016 - 03:47 PM
Right. It could also be that those wooden forms are in fact a section of the exterior parkade wall for the 989. Either way Legato's dirt wall stabilization is gone. Sure wish these pics were hosted somewhere that we could zoom in and take a closer look.
Edited by Gary H, 12 October 2016 - 03:52 PM.
Posted 22 October 2016 - 12:42 PM
MarkoJ, on 22 Oct 2016 - 1:31 PM, said:
....989 Johnson is already seriously excavating and they still have not announced a date for pre-sales.
Is the sales office in the old McCall's building not open yet?
ps: still hoping someone can explain the purpose of driving piles on this site where presumably excavation for underground parking will be taking place.
Edited by Nparker, 22 October 2016 - 12:44 PM.
Posted 22 October 2016 - 02:29 PM
Is the sales office in the old McCall's building not open yet?
ps: still hoping someone can explain the purpose of driving piles on this site where presumably excavation for underground parking will be taking place.
Probably looking for bedrock as it might be part of the former swamp at Vancouver and View where piles are going in.
Posted 22 October 2016 - 02:53 PM
the piles are driven 60 ft down to bedrock. A large drill will excavate the material from within the piles and then drill into the bedrock a few metres.. the piles with then be filled with concrete. the surrounding area with then be excavated and this area will not cave into the rest of the excavation when it is dug deeper.
Edited by HB, 22 October 2016 - 02:53 PM.
Posted 22 October 2016 - 03:07 PM
Same process for the former swamp under the Mayfair site.
Posted 22 October 2016 - 06:02 PM
Posted 22 October 2016 - 09:19 PM
The drill that will be used is currently at the Hillside Blanchard location on that school field looks like a crane with a big auger hanging from it
They already have an HR260 there on the Mayfair thread.
Posted 23 October 2016 - 08:10 PM
Is the sales office in the old McCall's building not open yet?
ps: still hoping someone can explain the purpose of driving piles on this site where presumably excavation for underground parking will be taking place.
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
Posted 25 October 2016 - 01:56 PM
The drill that will be used is currently at the Hillside Blanchard location on that school field looks like a crane with a big auger hanging from it
The drill is onsite auguring out the piles now. It was brought over from Hillside/Blanshard
http://youtu.be/LRflUfpQ6M4
Edited by HB, 25 October 2016 - 01:57 PM.