Jump to content

      



























BUILT
200 Cook Street
Uses: rental, commercial
Address: 200 Cook Street
Municipality: Victoria
Region: Urban core
Storeys: 5
200 Cook Street is a five-storey mixed-use rental apartment and ground floor commercial development in the Coo... (view full profile)
Learn more about 200 Cook Street on Citified.ca
Photo

[Cook St. Village] 200 Cook Street | Rentals | Built - completed in 2019


  • Please log in to reply
1225 replies to this topic

#1001 lanforod

lanforod
  • Member
  • 11,344 posts
  • LocationSaanich

Posted 09 June 2017 - 02:58 PM

Who is W ?

 

Past prez of the formerly greatest nation on earth.


  • Nparker likes this

#1002 Bingo

Bingo
  • Member
  • 16,666 posts

Posted 09 June 2017 - 03:04 PM

 

 sound is a pressure wave that forms when the media it is traveling in is disrupted in some way. 

 

Can be heard in a VV media type vehicle when the handbrake lets go and the car plunges off the back of the ferry, at which point another wave can actually be seen.


Edited by Bingo, 09 June 2017 - 03:16 PM.


#1003 aastra

aastra
  • Member
  • 20,742 posts

Posted 09 June 2017 - 03:12 PM

 

Who is W ?

 

That's going too far.


Edited by aastra, 09 June 2017 - 03:12 PM.


#1004 Bingo

Bingo
  • Member
  • 16,666 posts

Posted 09 June 2017 - 03:15 PM

That's going too far.

 

Oh, the one before eh!



#1005 GRT

GRT
  • Member
  • 106 posts

Posted 13 June 2017 - 06:14 PM

One of the workers told me today that the metal pieces are in the ground 30 ft deep to stabilize the excavation and keep out water.  They will remain in the ground around the finished structure   The foundation will be dug 20 ft deep.


  • Mike K. and VicHockeyFan like this

#1006 Kapten Kapsell

Kapten Kapsell
  • Member
  • 3,539 posts

Posted 23 June 2017 - 10:42 AM

Cook Street Project.JPG

 

Taken Yesterday...



#1007 GRT

GRT
  • Member
  • 106 posts

Posted 26 June 2017 - 12:39 PM

Both an excavator and a backhoe on site today.  The remains of the apartment's foundation has been removed, and the (foundation?) digging has started on the south side of the lot.



#1008 GRT

GRT
  • Member
  • 106 posts

Posted 27 June 2017 - 05:55 PM

Today ...

IMG_20170627_145942428_HDR.jpg

 

IMG_20170627_150122296.jpg


  • Nparker likes this

#1009 GRT

GRT
  • Member
  • 106 posts

Posted 28 June 2017 - 03:07 PM

June 28th

 

IMG_20170628_143932773_HDR.jpg

 

IMG_20170628_143938194.jpg

 

IMG_20170628_144017308.jpg


  • Nparker likes this

#1010 Glen

Glen
  • Member
  • 279 posts

Posted 19 July 2017 - 06:11 PM

Does anyone know when pre-sales are to begin? I thought it was scheduled for June............



#1011 Kapten Kapsell

Kapten Kapsell
  • Member
  • 3,539 posts

Posted 27 July 2017 - 07:52 AM

The concrete pour for this site is underway...


  • Nparker likes this

#1012 Glen

Glen
  • Member
  • 279 posts

Posted 30 July 2017 - 01:53 PM

This , if I'm correct, is one of the first projects to not start pre-sales before construction. Another sign of a red hot market and a builder not looking to sell any sooner than possible so as to capture the most profit.



#1013 Mike K.

Mike K.
  • Administrator
  • 83,507 posts

Posted 30 July 2017 - 02:02 PM

We've actually seen quite a lot of this in recent years. Jukebox, 989, Hudson Place One, Cityzen, 595 Pandora, Customs House, and 200 Cook, among others, got underway before sales began.


Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.


#1014 Bingo

Bingo
  • Member
  • 16,666 posts

Posted 08 August 2017 - 08:59 PM

Down into the old stream bed?

 

IMG_7295.JPG

 

 



#1015 Nparker

Nparker
  • Member
  • 40,711 posts

Posted 08 August 2017 - 09:11 PM

Down into the old stream bed?...

I guess this means piles will be driven/poured here as part of the excavation process. 



#1016 Bingo

Bingo
  • Member
  • 16,666 posts

Posted 08 August 2017 - 10:32 PM

The elevation in that area is around 4-5 metres so I think they are almost down to sea level.

http://vicmap.victor...l?viewer=Public

 

20170808_230949.jpg

 

 

 

 



#1017 Glen

Glen
  • Member
  • 279 posts

Posted 09 August 2017 - 09:02 AM

Any word when sales will begin?  Is there a sales center as yet?



#1018 soils guy

soils guy
  • Member
  • 23 posts

Posted 12 August 2017 - 06:49 AM

I don't expect driven/drilled piles, all that perimeter bracing would now be in the way. More likely that a raft slab will be placed at this point. The concept being that the weight of the excavated soil balances the weight of the building being constructed. They may form pockets around the braces so they can extract them later and then patch the holes in the slab.


  • VicHockeyFan likes this

#1019 Bingo

Bingo
  • Member
  • 16,666 posts

Posted 12 August 2017 - 07:57 AM

It looked like there was already concrete around the ends of the bracing when I took the photo 4 days ago.



#1020 soils guy

soils guy
  • Member
  • 23 posts

Posted 15 August 2017 - 10:27 AM

That concrete at the ends of the bracing is just what is called a "dead man" Its basically foundation support for the temporary bracing. The slab would be poured over top of the dead man.



You're not quite at the end of this discussion topic!

Use the page links at the lower-left to go to the next page to read additional posts.
 



0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users