August 16
BUILT Oaks at Bellewood Park Use: condo Address: 1201 Fort Street Municipality: Victoria Region: Urban core Storeys: 6 Condo units: (sub-penthouse, penthouse, 1BR + den, 2BR + den, junior 2BR) Sales status: sold out / resales only |
Posted 19 August 2019 - 08:06 AM
Posted 19 August 2019 - 08:46 AM
It appears that their focus is on the concrete work of the 4 story Cypress building at this point (woodframe), rather than the larger 6 story Oaks building (concrete).
Posted 17 September 2019 - 09:32 AM
Glen, if you hurry up and buy a unit at Bellewood Park, apparently you can add an EV charging station for $9,750. A limited number are available.
Are other projects in Victoria offering this as an add-on, extra-cost option?
Posted 17 September 2019 - 09:40 AM
^ I'm surprised that Victoria hasn't jumped on the residential EV bandwagon. Richmond made it a requirement in all new residential construction almost two years ago... 100% of resident parking spaces must have access to a Level 2 outlet.
Posted 17 September 2019 - 09:43 AM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
Posted 17 September 2019 - 09:50 AM
Yikes. I don’t think that’s something Victoria’s market can absorb that quickly in terms of cost. If it’s $10k per unit at Bellewood I would imagine equipping 100 stalls would be less, but still several thousand more per residence.
Depends on the level of charging offered. We require Level 2, which has an estimated install cost of $760-$3,023 per stall depending on whether the outlet is dedicated or not. Level One has an estimated cost of $1,443 per stall (talking mid- and high-rise construction. Townhouses are significantly cheaper). The complete design and policy guide is online, here: https://pluginbc.ca/...Governments.pdf
Posted 17 September 2019 - 09:57 AM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
Posted 17 September 2019 - 11:32 AM
The costs indicated in the PluginBC document ($760-$3,023 per stall) don't appear to address costs arising from upgrading the service side, i.e. the additional costs that BC Hydro will charge for adding capacity, and the additional building system costs, e.g. increasing transformer capacity, etc.. Although load sharing can reduce overall EV charging requirements, there is still a significant increase in estimated peak demand for a building or project, especially with multiple charging stations, which means scaling up the electrical infrastructure, not merely the distribution system to the charging stations. Then there are meter install charges and billing systems required. It is not simply a matter of running conduit, pulling wires, and installing some charging cables.
I understand that Abstract had to negotiate a significant service supply upgrade with BC Hydro if they were to be in a position to offer more than a handful of stalls.
Where there are commercial parkades offering charging stations, they ask you to move your car once charged. Really? Battery EVs (as distinct from hybrids) require 5-8 hours to be fully charged (from 0 to 100%) on Level 2. I can't see drivers popping down to the parkade mid-day to move their vehicle, unless they had a very short commute. In a residential setting, how do you fairly regulate access to a handful of charging stations? The vehicle with the lowest charge gets juiced first?!
Posted 17 September 2019 - 11:51 AM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
Posted 17 September 2019 - 01:00 PM
Thank goodness for Site C, eh?
Yes, eh!
For example, EV charging rates are currently much higher in Ontario than in Quebec. Affordable charging rates could become a competitive advantage for B.C., especially in the event that commercial vehicles go electric or at least hybrid.
Posted 17 September 2019 - 07:32 PM
Most Petro Canada stations have or are getting charging stations with DC fast chargers, one hour max tho.
Posted 18 September 2019 - 09:54 AM
A metrovancouver info page with a much higher estimate of costs to install.
http://www.metrovanc...es/default.aspx
You would think there would be significant savings from designing in provisions for EV chargers from the outset on new builds.
Posted 18 September 2019 - 11:04 AM
A metrovancouver info page with a much higher estimate of costs to install.
http://www.metrovanc...es/default.aspx
You would think there would be significant savings from designing in provisions for EV chargers from the outset on new builds.
Metro Vancouver appears to include the cost of the charger. CoRichmond only requires the outlet to be there, the resident is responsible for purchasing a charging device. The PlugIn BC cost estimates are based on providing outlets only to 100% of the parking stalls.
Posted 21 September 2019 - 12:34 AM
Marko Juras, REALTOR® & Associate Broker | Gold MLS® 2011-2023 | Fair Realty
www.MarkoJuras.com Looking at Condo Pre-Sales in Victoria? Save Thousands!
Posted 27 November 2019 - 03:54 PM
Sales.....
August 2018 (1st week ) = 25%
September 2018 = 40%
January 2019 = 50%
There hasn't been an update for 10 months.
Posted 15 December 2019 - 01:11 PM
How has construction progressed?
Posted 16 December 2019 - 06:07 AM
Posted 16 December 2019 - 06:29 AM
Know it all.