They are so very very fortunate with the weather being how it is. Let's hope this keeps up into the weekend.
[Johnson Street Bridge REPLACEMENT] General, technical, design and naming discussion
#5181
Posted 08 December 2017 - 10:00 AM
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#5185
Posted 08 December 2017 - 12:46 PM
#5186
Posted 08 December 2017 - 12:48 PM
#5187
Posted 08 December 2017 - 12:51 PM
- VicHockeyFan likes this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#5188
Posted 08 December 2017 - 01:28 PM
We won’t know if it can until it does!
Well, that's true enough I guess. If it does not lift it, what's plan B? It's the largest crane in the West. Those cables must be something else too.
Edited by VicHockeyFan, 08 December 2017 - 01:29 PM.
#5189
Posted 08 December 2017 - 01:43 PM
... at what angle will they slide it in at? ...
That's what she said.
- VicHockeyFan likes this
#5190
Posted 08 December 2017 - 02:52 PM
Well, that's true enough I guess. If it does not lift it, what's plan B? It's the largest crane in the West. Those cables must be something else too.
VHF has crane envy right now.
- VicHockeyFan likes this
#5191
Posted 08 December 2017 - 02:58 PM
VHF has crane envy right now.
And with this project's troubled history, I certainly hope there are no erection problems.
#5192
Posted 08 December 2017 - 03:42 PM
It’s hard to believe that darned crane can lift the entire span. I wonder how many lift points there will be.
In this shot the crane looks more than adequate. Remember, the deck is mostly a frame, large but not excessively heavy. The Arctic Tuk is a 600 ton crane and it lifted the old rail span. The DB can lift 900 tons. I've included a pic of the Arctic Tuk lifting the rail span below.
Edited by Gary H, 08 December 2017 - 03:56 PM.
#5193
Posted 08 December 2017 - 03:51 PM
We're about to lift the second ring. A lot of connection prep goes into these rings, it takes a long time to get ready.
- Nparker likes this
#5194
Posted 08 December 2017 - 03:55 PM
Will you be taking some pics of the pieces that have been put in place so far Gary?
#5195
Posted 08 December 2017 - 03:58 PM
I can't see the barge deck and I suspect it'll be docked at this location overnight. But I will post some closing shots, including the second ring lift...
Edited by Gary H, 08 December 2017 - 04:00 PM.
- VicHockeyFan and Nparker like this
#5197
Posted 08 December 2017 - 04:19 PM
- Bingo likes this
Know it all.
Citified.ca is Victoria's most comprehensive research resource for new-build homes and commercial spaces.
#5200
Posted 08 December 2017 - 04:58 PM
What's the name of the barge with the bridge deck on it?
And can it be moored there that long, or is it in violation of the new Gorge Waterway stay restriction?